广东佳丽百花丛论坛,唐人阁trg最新论坛,老九品茶官网下载app,一品茶楼官方网站入口

您的位置:首页>Journalism>Chain - dry construction method

Chain - dry construction method

2021-07-13 15:27:53

Tile laying roofing felt, installation, use galvanized self tapping screws to ensure that the tiles on the next page are fixed from left to right. Inclined gutter tiles (drainage tiles) should be installed first. Install the ridge inclined ridge, and set aside a 150mm gap mortar lining according to the gap, and then both sides of the puzzle tile surface have been blocked with hooks, hook inclined documents and ridge width. The ridge tile is difficult to dry, and the joint of the ridge tile shall be oriented away from the rain. Gutter installation: the bottom of the inclined drainage ditch and tile mortar is paved to fill the domestic gap, plastered with mortar, and then pointed with pigment mortar.

数据不存在ID为38

相关内容

佛山粤彩陶瓷有限公司版权所有           技术支持:创意动力      备案号:粤ICP备2021123794

依安县shb812| 崇州市f8m402| 乌拉特前旗flt392| 涡阳县8pj478| 新和县bh9538| 固阳县tgl543| 阿坝l9i966| 福安市d9p735| 万全县orr146| 永康市9nr579| 张家港市mz7670| 固阳县dnu758| 四平市r7t981| 乌拉特后旗rjx911| 泸西县n8r441| 遂平县qdi786| 沙洋县8db957